Full Apartment Renovation in Rupea

Need a full renovation in Rupea? Whether it's a studio or a three-room flat, SmallJobs connects you with teams in the Rupea area, Brașov county, who cover all trades and quote fairly.

Post a Job for Free
✓ Free platform
✓ Verified professionals
✓ Quick response

About this service

In a full renovation, the greatest risk isn't the quality of any single trade but the coordination between them. The decorator can't start before the electrician has finished the routes, flooring can't be laid before the screed is fully dry — which takes roughly a week per centimetre of thickness — and doors are fitted after decorating but before skirting. Every deviation from this order is paid for in redone work and delays. A serious team presents a staged programme from the outset, with the decision points where your finishes must already be chosen, and tells you clearly when to order long lead-time materials such as windows, internal doors, or kitchen units.

Full Apartment Renovation in Rupea, Brașov

Rupea is a locality in Brașov county, in the historical region of Transylvania. Many professionals working here also cover nearby localities such as Făgăraș, Brașov, Săcele, so you can still receive offers when the right specialist is just around the corner.

Full Apartment Renovation in Brașov

Brașov County, with its capital of nearly 300,000 inhabitants, is one of Romania's most dynamic counties. A booming IT sector, intense tourism driven by Poiana Brașov and the medieval fortress, along with processing industry in Codlea, Făgăraș, and Săcele, make Brașov an economic engine of Transylvania. Demand for skilled services is high, and the quality of life constantly attracts workers from across the country.

Estimated Prices — Full Apartment Renovation in Rupea

Service Estimated Price
Turnkey renovation (sqm, labour) 350–700 RON
35 sqm studio (complete labour) 12,500–25,000 RON
55 sqm 2-room flat (complete labour) 19,000–39,000 RON
75 sqm 3-room flat (complete labour) 26,000–53,000 RON
Strip-out and debris removal (sqm) 35–75 RON

Prices are indicative and may vary.

How SmallJobs Works

1

Post the job

Describe what you need, choose a category and location. It's free and takes under a minute.

2

Receive offers

Professionals in your area contact you with offers and availability.

3

Choose your pro

Compare profiles, reviews, and prices. Pick whoever fits best.

4

Get it done

The professional comes and completes the work. Leave a review to help the community.

Post a Job for Free

What to check before hiring a full apartment renovation

Frequently Asked Questions

How long does a full renovation take?
A studio needs 4–7 weeks, a two-room flat 6–10 weeks, and a three- or four-room flat 10–16 weeks. These timescales include mandatory drying times that cannot be compressed: screed needs roughly a week of drying per centimetre of thickness.
What is the correct order of works?
Strip-out and removal, new partitions, electrical and plumbing services, pressure testing, plastering and skimming, waterproofing in wet areas, screed, tiling, internal joinery, decorating, flooring, electrical accessories and sanitaryware, skirting, and finally furniture. Reversing stages leads to costly rework.
Can I live in the flat during the renovation?
No, not for a full renovation. The home is left for long periods without water, power, or flooring, and dust from demolition and sanding makes the space practically uninhabitable. Budget for alternative accommodation for the whole duration, with a 2–3 week margin over the promised completion date.
Do I need a permit to renovate in Rupea?
No permit is needed for interior finishes and services. It becomes mandatory if you alter the structure — removing a load-bearing wall, changing openings in structural walls, or extending the floor area. In Rupea, as everywhere, the owners' association usually requires advance notice and observance of quiet hours.
Can I remove the wall between a room and the kitchen?
Only if the wall isn't structural. In frame-structure blocks, internal walls are usually non-structural and can be removed. In blocks with concrete structural walls, the work requires a technical assessment and a permit. Never let a team decide this without documented verification.
Who buys the materials, me or the team?
Common practice is for visible finishes — tiles, flooring, doors, sanitaryware, light fittings — to be chosen and bought by the client, with building consumables brought by the team. Ask for a complete materials list with quantities at the start so you can order in good time.

Other services in Rupea

Full Apartment Renovation in other locations in Brașov

Find a trusted professional

Post for free and receive offers from verified professionals in your area.

Get Started — It's Free!
Offer services? Register as a professional