Apartment Electrical Wiring in Cluj-Napoca

Rewiring your flat in Cluj-Napoca? In Cluj-Napoca, a major urban centre in Cluj county, most blocks have old aluminium installations with no earth that can no longer cope with today's appliances. On SmallJobs you'll find licensed electricians with portfolios and reviews from real clients.

Post a Job for Free
✓ Free platform
✓ Verified professionals
✓ Quick response

About this service

A properly rewired installation gives you peace of mind for the next 30–40 years. The electrician sizes each circuit to the load it feeds, uses copper conductors of 1.5 mm² for lighting, 2.5 mm² for sockets, and 4–6 mm² for heavy appliances, runs everything in conduit so a new cable can be pulled later, and separates circuits so a single fault doesn't leave the whole flat without power. Earthing is provided at every socket, and at completion the insulation resistance and the continuity of the protective conductor are measured, with the results recorded in writing.

Apartment Electrical Wiring in Cluj-Napoca, Cluj

Cluj-Napoca is one of the main towns in Cluj county, in the historical region of Transylvania. Many professionals working here also cover nearby localities such as Câmpia Turzii, Turda, Gherla, so you can still receive offers when the right specialist is just around the corner.

Apartment Electrical Wiring in Cluj

Cluj County, with its capital at Cluj-Napoca — the largest IT and university hub in Transylvania, with nearly 320,000 inhabitants — is one of Romania's most important economic growth poles. The county's economy is diversified, with a European-scale technology and outsourcing services sector alongside industry, agriculture, and active cultural tourism. The labor market is highly competitive, and demand for professional services at all levels is among the highest in the country.

Estimated Prices — Apartment Electrical Wiring in Cluj-Napoca

Service Estimated Price
Full rewire, studio flat 3,500–7,000 RON
Full rewire, 2-room flat 5,500–11,000 RON
Full rewire, 3–4 room flat 8,000–18,000 RON
New circuit (route, box, socket) 180–380 RON
Wall chasing (linear metre) 18–35 RON

Prices are indicative and may vary.

How SmallJobs Works

1

Post the job

Describe what you need, choose a category and location. It's free and takes under a minute.

2

Receive offers

Professionals in your area contact you with offers and availability.

3

Choose your pro

Compare profiles, reviews, and prices. Pick whoever fits best.

4

Get it done

The professional comes and completes the work. Leave a review to help the community.

Post a Job for Free

What to check before hiring a apartment electrical wiring

Frequently Asked Questions

What testing is done at the end?
The electrician measures insulation resistance on each circuit, verifies continuity of the protective conductor, tests RCD operation, and confirms correct polarity at the sockets. Results are recorded in a test certificate, which is worth keeping together with the installation schematic.
What warranty comes with a new installation?
Labour is typically warranted for 2–5 years, with components covered by the manufacturer's warranty. Request the warranty in writing and keep the quote, the schematic, and the test certificate — these are the documents that matter if a problem arises or when selling the flat.
Can I rewire in phases, room by room?
It's possible, but not ideal. The board and main circuits have to be redone in full anyway, and phasing means repeated dust and disruption plus a higher total cost. If budget requires phasing, prioritise the kitchen, bathroom, and the heavy-appliance circuits.
How much does rewiring a flat cost in Cluj-Napoca?
For a two-room flat, labour typically falls between 4,500 and 11,000 RON, depending on area, circuit count, and wall construction. Materials — conductors, conduit, boxes, accessories, and consumer unit components — usually add another 2,000–5,000 RON. A proper quote lists them separately.
How long does a rewire take?
A two-room flat is usually done in 5–8 working days, and a three- or four-room flat in 8–14 days. Chasing walls and pulling cables takes the longest; accessories are fitted at the end, after decorating, which needs another 1–2 days.
Do I need to move out during the work?
Generally yes, at least for the chasing stage, which creates a great deal of dust and noise and leaves parts of the flat without power. If the work is phased you can stay, but comfort is significantly reduced. Most people combine a rewire with a full renovation.

Other services in Cluj-Napoca

Apartment Electrical Wiring in other locations in Cluj

Find a trusted professional

Post for free and receive offers from verified professionals in your area.

Get Started — It's Free!
Offer services? Register as a professional